I took the day off so I could work on the Bathroom. I took yesterday off also but by the time I was able to get to the bathroom the day was pretty much over. So Joyce and I cleaned up the thinset from the tiles on the floor. I finished that up this morning.
But the Hallway, Entry, and Bathroom floor is all tiled. Well for the most part - we were 4 tiles short of finishing. Arrrrggggh I say! Oh well. Here is what it looks like.
All we have to do is finish the tiling (four tile) and grout then the floor will be done.
Next on the list - grout the tub/shower. This is not hard but it certainly does not go like on TV and I did not have the magic of TV to help out. But between Nikole, Joyce, and I we got it done. Meg probably would have helped but there wasn't any room.
Here are the images of this adventure.
We are not finished with the tiling in the bathroom. I still have the wall behind the toilet area. Which is the wall with the gray backerboard. This whole area will be tiled as well as the half wall between the sinks and toilet. The tile will cover both sides of the wall. We will also carry the tile over the sinks for the back splash and the accent also.
Tomorrow - texture the walls and ceilings in the bathroom at least. In the hallway and entry would be ideal. Or maybe we will just take the day off and have some fun. Who knows...
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment